9001cc金沙以诚为本

News

news center

Production News Express

Delivery and Departure of 16,000 TEU LNG Dual-fuel Container Vessel “MSC OLBIA”

2024-12-18 views 127

X146516000TEU双燃料集装箱船“MSCOLBIA”-ed6bb192f8884d29ba3f88e76af922a7

On the morning of December 18th, the third 16,000 TEU LNG dual-fuel container vessel “MSC OLBIA” built by our Group’s Yangzi Xinfu Shipbuilding for MSC, departed from the shipyard wharf and delivered to shipowner for operation.

 20241126【定名】X146516000TEU双燃料集装箱船定名典礼(3)-06423b7795404d3bb71b28c251d76cbc

On November 26th, our group held a naming and blessing ceremony for the new vessel together with Shipowner MSC. Ms. Chen Zeyi, named the new vessel "MSC OLBIA", cut the string, tossed champagne, sounded the whistle, and signed the new vessel's commemorative plaque together with the captain as a lasting memento.

 20241216【交船】X146516000TEU双燃料集装箱船“MSCOLBIA”具名交船-6985076f8c43402187371bc42e5af89e

On December 16th, Mr. CH Giuseppe Gargiulo, the Newbuilding Manager of MSC China, and Mr. Liu Yinjun, Deputy General Manager of Yangzi Xinfu Shipbuilding, signed the delivery documents on behalf of the two parties under the witness of the representatives of all parties.


【网站地图】